{"id":3799,"date":"2019-06-18T10:34:57","date_gmt":"2019-06-18T07:34:57","guid":{"rendered":"http:\/\/www.magaripoa.com\/?p=3799"},"modified":"2019-06-18T10:41:29","modified_gmt":"2019-06-18T07:41:29","slug":"nairobi-western-bypass-stalls-after-residents-reject-the-redesign-of-proposed-interchange-at-wangige-shopping-centre-kenyantraffic","status":"publish","type":"post","link":"https:\/\/www.magaripoa.com\/gari\/nairobi-western-bypass-stalls-after-residents-reject-the-redesign-of-proposed-interchange-at-wangige-shopping-centre-kenyantraffic\/","title":{"rendered":"Nairobi Western Bypass stalls after residents reject the redesign of proposed interchange at Wangige Shopping Centre"},"content":{"rendered":"<p class=\"p3\"><span class=\"s4\" style=\"color: #000000; font-size: 12pt;\">The construction of the Sh17 billion Western Bypass risks stalling after residents rejected the redesign of proposed interchange at Wangige Shopping Centre.<\/span><\/p>\n<p class=\"p3\"><span class=\"s4\" style=\"color: #000000; font-size: 12pt;\">The new design eats into Wangige Primany School land as well that of its proposed secondary school. It also touches St Peter\u2019s ACK Church, Ndunyu, with its newly-constructed commercial block, vicarage and an academy set to be brought down.<\/span><\/p>\n<p><img data-recalc-dims=\"1\" decoding=\"async\" src=\"https:\/\/i0.wp.com\/www.mediamaxnetwork.co.ke\/wp-content\/uploads\/2019\/06\/wangige-school-and-church-land..gif\" \/><\/p>\n<p class=\"p3\"><span class=\"s4\" style=\"color: #000000; font-size: 12pt;\">Subsequently, parents at Wangige Primary and Secondary schools, led by the board of management, have petitioned the Kenya National Highway Authority (KeNHA) to revert to the original design, which they said did not interfere with the school and the church infrastructure.<\/span><\/p>\n<p class=\"p3\"><span class=\"s4\" style=\"color: #000000; font-size: 12pt;\">The petition, signed by the school board chairman David Thimba, a former University of Nairobi lecturer, has been copied to Kiambu Senator Kimani Wamatangi, who is the chairman of the Senate Roads and Transport committee.<\/span><\/p>\n<p class=\"p3\"><span style=\"color: #000000; font-size: 12pt;\"><span class=\"s4\">The parents have given KeNHA a seven-day ultimatum to revert to the original design, failure to which they will seek legal redress.\u00a0<\/span><span class=\"s4\">They faulted the road agency for redesigning the road without involving all stakeholders.<\/span><\/span><\/p>\n<p class=\"p3\"><span class=\"s4\" style=\"color: #000000; font-size: 12pt;\">\u201cWe demand that the construction be returned to its original design failure to which we shall be compelled to seek legal redress.\u00a0We will as well be forced to call for a public mass action,\u201d reads the petition in part.<\/span><\/p>\n<p class=\"p3\"><span class=\"s4\" style=\"color: #000000; font-size: 12pt;\">Thimba said the aggrieved parties are not opposed to the project, but are against the change of design without consultation.<\/span><\/p>\n<p class=\"p3\"><span class=\"s4\" style=\"color: #000000; font-size: 12pt;\">\u201cWe were not even informed of the changes, we are relying on third parties. We would have been ambushed by the contractors,\u201d he said.<\/span><\/p>\n<p class=\"p3\"><span style=\"color: #000000; font-size: 12pt;\"><span class=\"s4\">The Gitaru-Wangige-Ruaka bypass is being built by the China Road &amp; Bridge Corporation.\u00a0<\/span><span class=\"s4\">Wamatangi has promised to visit the area with a view to<span class=\"Apple-converted-space\">\u00a0\u00a0<\/span>assessing the situation before presenting the petition to the Senate committee.<\/span><\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"color: #000000; font-size: 12pt;\">This article first appeared on <a style=\"color: #000000;\" href=\"http:\/\/www.mediamaxnetwork.co.ke\/news\/528903-528903\/\">Media Max<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The construction of the Sh17 billion Western Bypass risks stalling after residents rejected the redesign of proposed interchange at Wangige Shopping Centre. The new design eats into Wangige Primany School land as well that of its proposed secondary school. It also touches St Peter\u2019s ACK Church, Ndunyu, with its newly-constructed commercial block, vicarage and an&#8230;<\/p>\n","protected":false},"author":1,"featured_media":3801,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"advanced_seo_description":"","jetpack_seo_html_title":"","jetpack_seo_noindex":false,"jetpack_seo_schema_type":"","cybocfi_hide_featured_image":"","_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[7],"tags":[],"class_list":["post-3799","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"jetpack-related-posts":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/pej6K6-Zh","jetpack_likes_enabled":true,"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.magaripoa.com\/gari\/wp-content\/uploads\/Western-Bypass-Road-Construction-begins-Gitaru-to-Ruaka-magaripoa.jpg?fit=738%2C461&ssl=1","_links":{"self":[{"href":"https:\/\/www.magaripoa.com\/gari\/wp-json\/wp\/v2\/posts\/3799","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.magaripoa.com\/gari\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.magaripoa.com\/gari\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.magaripoa.com\/gari\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.magaripoa.com\/gari\/wp-json\/wp\/v2\/comments?post=3799"}],"version-history":[{"count":0,"href":"https:\/\/www.magaripoa.com\/gari\/wp-json\/wp\/v2\/posts\/3799\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.magaripoa.com\/gari\/wp-json\/wp\/v2\/media\/3801"}],"wp:attachment":[{"href":"https:\/\/www.magaripoa.com\/gari\/wp-json\/wp\/v2\/media?parent=3799"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.magaripoa.com\/gari\/wp-json\/wp\/v2\/categories?post=3799"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.magaripoa.com\/gari\/wp-json\/wp\/v2\/tags?post=3799"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}