{"id":6552,"date":"2024-11-12T23:38:47","date_gmt":"2024-11-12T20:38:47","guid":{"rendered":"https:\/\/www.magaripoa.com\/?p=6552"},"modified":"2024-11-12T23:38:47","modified_gmt":"2024-11-12T20:38:47","slug":"how-kicking-matatus-out-of-cbd-will-unfold-only-muthurwa-terminus-will-remain-to-serve-jogoo-and-lusaka-roads","status":"publish","type":"post","link":"https:\/\/www.magaripoa.com\/gari\/how-kicking-matatus-out-of-cbd-will-unfold-only-muthurwa-terminus-will-remain-to-serve-jogoo-and-lusaka-roads\/","title":{"rendered":"How kicking matatus out of CBD will unfold only Muthurwa terminus will remain to serve Jogoo and Lusaka roads"},"content":{"rendered":"<p><span style=\"font-size: 12pt;color: #000000\">As the clock ticks against old transport order, operators are slowly coming to terms with Nairobi Metropolitan Service (NMS) plan on new terminus.<\/span><\/p>\n<p><span style=\"font-size: 12pt;color: #000000\">Given the many previous attempts to knock off matatus from the city centre, many do not believe this will pay. But as they cross their fingers, praying for another cropper, the new bus termini are coming up fast at the various corners of the city.<\/span><\/p>\n<p><span style=\"font-size: 12pt;color: #000000\">It is a race against an old, confused order. At the corner of the Railways Club, the once green lawns have been swallowed by concrete as Green Park terminus to serve PSVs plying Ngong and Lang\u2019ata roads takes shape.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-size: 12pt;color: #000000\">The Green Park terminus is scheduled to be completed in about a week, according to NMS Transport Director Michael Ochieng.<\/span><\/p>\n<p><span style=\"font-size: 12pt;color: #000000\">Another terminus at the junction of Bunyala and Workshop Road is also in its final stages. It will serve PSVs from Mombasa Road (South B, South C, Industrial Area, Imara Daima, Athi River, Kitengela and Machakos).<\/span><\/p>\n<p><span style=\"font-size: 12pt;color: #000000\">Long-distance PSVs from Mt Kenya region and those entering from Thika Superhighway will terminate at the new Desai and Park Road termini where they will also pick and drop passengers.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-size: 12pt;color: #000000\">There is another pick-up and drop-off point under construction at Westlands just near the Fig tree. There will also be Landhies Road terminus which will take care of the vehicles from Eastlands.<\/span><\/p>\n<p><span style=\"font-size: 12pt;color: #000000\">The Muthurwa terminus is expected to remain to serves PSVs from Jogoo and Lusaka roads.<\/span><\/p>\n<p><span style=\"font-size: 12pt;color: #000000\">\u201cWe are working together with PSV operators and consulting with them while constructing the termini. It is a plan which the PSV operators are participating in to ensure the it is well implemented and their concerns incorporated,\u201d Ochieng said on November 13.<\/span><\/p>\n<p><span style=\"font-size: 12pt;color: #000000\">But old habits die hard and Kenyans are a doubting lot. James Mongina, a matatu operator on Jogoo road to Kayole, is skeptical about the whole thing. He says only a quarter of the vehicles plying Jogoo and Lusaka road routes use the Muthurwa terminus, yet it is already overwhelmed.<\/span><\/p>\n<p><span style=\"font-size: 12pt;color: #000000\">\u201cIt will be almost impossible for Jogoo and Lusaka road matatus to stop at this point, the kind of traffic jam that will occur will create a ripple effect, blocking City Stadium round about, Lusaka road and other roads,\u201d said Mongina, adding that passengers coming to town from Donholm and its environs will alight at Hamza and trek.<\/span><\/p>\n<p><span style=\"font-size: 12pt;color: #000000\">Mongina said even if the kiosks at the terminus are removed, it will still be difficult for it to accommodate all the matatus.<\/span><\/p>\n<p><span style=\"font-size: 12pt;color: #000000\">\u201cLet them try but I assure you it will be chaos on the first day. If at the moment, it takes me two hours to get into the terminus from City Stadium, what about when this plan takes effect?\u201d he asked.<\/span><\/p>\n<p><span style=\"font-size: 12pt;color: #000000\">Fig Tree Terminus at Ngara will serve matatus from Waiyaki Way, Kipande and Limuru roads. Operators at this station similarly have doubts that this move by NMS will work.<\/span><\/p>\n<p><span style=\"font-size: 12pt;color: #000000\">According to Patrick Njuguna, a PSV operator using the Limuru Road route, part of the problem is caused by the Government itself since a majority of its services is centered around the CBD to Upper Hill.<\/span><\/p>\n<p><span style=\"font-size: 12pt;color: #000000\">\u201cEveryone wants to get to town at some point of the day, whether with a matatu or a personal vehicle. If the services were scattered, then maybe CBD would not be as congested as they think,\u201d Njuguna said.<\/span><\/p>\n<p><span style=\"font-size: 12pt;color: #000000\">Njuguna said personal vehicles are the biggest cause of congestion in the CBD.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-size: 12pt;color: #000000\">Read the full story on <a href=\"https:\/\/www.standardmedia.co.ke\/amp\/nairobi\/article\/2001394748\/yet-another-attempt-at-city-order-amid-doubts\"><strong>Standard<\/strong><\/a><\/span><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As the clock ticks against old transport order, operators are slowly coming to terms with Nairobi Metropolitan Service (NMS) plan on new terminus. Given the many previous attempts to knock off matatus from the city centre, many do not believe this will pay. But as they cross their fingers, praying for another cropper, the new&#8230;<\/p>\n","protected":false},"author":1,"featured_media":6352,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"advanced_seo_description":"","jetpack_seo_html_title":"","jetpack_seo_noindex":false,"jetpack_seo_schema_type":"","cybocfi_hide_featured_image":"","_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[1905],"tags":[],"class_list":["post-6552","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"jetpack-related-posts":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/pej6K6-1HG","jetpack_likes_enabled":true,"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.magaripoa.com\/gari\/wp-content\/uploads\/Kicking-Matatus-Out-of-CBD-magaripoa.jpg?fit=1280%2C720&ssl=1","_links":{"self":[{"href":"https:\/\/www.magaripoa.com\/gari\/wp-json\/wp\/v2\/posts\/6552","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.magaripoa.com\/gari\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.magaripoa.com\/gari\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.magaripoa.com\/gari\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.magaripoa.com\/gari\/wp-json\/wp\/v2\/comments?post=6552"}],"version-history":[{"count":0,"href":"https:\/\/www.magaripoa.com\/gari\/wp-json\/wp\/v2\/posts\/6552\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.magaripoa.com\/gari\/wp-json\/wp\/v2\/media\/6352"}],"wp:attachment":[{"href":"https:\/\/www.magaripoa.com\/gari\/wp-json\/wp\/v2\/media?parent=6552"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.magaripoa.com\/gari\/wp-json\/wp\/v2\/categories?post=6552"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.magaripoa.com\/gari\/wp-json\/wp\/v2\/tags?post=6552"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}